THE PROJECT

Aston Manor Brewery were considering the cost savings of having a vehicle maintenance unit in house, at their prestigious site in Birmingham when they contacted Capital Garage Equipment.

WHAT DID WE DO?

We were on hand to offer advice and guidance in the project, from initial ideas to drawings showing how the facility will look.

Commercial Garage Equipment, supplied, delivered and installed 3 steel fabricated pits into Aston Manor Brewery to accommodate for all their vehicles, these included the below spec’s:

  • 19m Steel fabricated pit including a cross pit brake tester and headlight tester to allow for a one-stop lane for pre-MOT testing all of Aston Manor vehicles
  • 8m Steel fabricated pit to allow for the maintenance of Aston manors tractor units
  • 16m Steel fabricated pit to allow for the maintenance of Aston manors trailers
  • JOB SPECS
  • THE CLIENT
    Aston Manor Brewery
  • THE JOB
    Specifying and installing 3 steel pits for the client’s in house vehicle maintenance unit.
  • EQUIPMENT
    > 1x 19m steel pit
    > 1x 8m steel pit
    > 1x 16m steel pit
  • SERVICES
    > CAD Drawings
    > Installation
    > Project Management