THE PROJECT

Capital Garage Equipment worked with Transam Trucking to fit out one of their sites with a number of products.

WHAT DID WE DO?

Capital Garage Equipment worked with Transam to install a number of pits for their fleet. Having had trouble with a previous supplier, we were happy to step in to assist with the installation of 4 steel pits and a washdown pit.

‘I’m unsure of how we may have finished this project, if you hadn’t of stepped in when our suppliers were over there heads’

– J H Vaudrey

  • JOB SPECS
  • THE CLIENT
    Transam Trucking
  • THE JOB
    Installing a number of steel pits for Transam Trucking’s fleet.
  • EQUIPMENT
    > 2x 17m steel pits
    > 2x 20m steel pits
    > 1x 20m washdown pit
  • SERVICES
    > Installation